Research libraryTechnical record

R02 fluid subsystem: capacity and refill stroke

The liquid chamber and its follower are shown at the scale of the complete module.
Reservoir assemblyThe liquid chamber and its follower are shown at the scale of the complete module.Inspect the reservoir ↗

Editable FreeCAD assembly · geometry generator · part register · calculated dimensions · solid checks

R02 retains the R01 primary envelope, centred outlet, offset septum and 22 component IDs. It changes two dimensions that materially affect use:

Mechanical property R01 R02
Rear piston stop, z 57.80 mm 61.80 mm
Primary stroke between stops 20.25 mm 16.25 mm
Primary theoretical swept capacity 2.290 mL 1.838 mL
Primary displacement from illustrated pose 2.098 mL 1.815 mL
External refill handle travel before contacting rear plate 4.00 mm 27.00 mm
External refill displacement from illustrated pose, limited by first collision 0.973 mL 6.338 mL

The primary stop is an extension of the vented rear plug. Its bore remains open to the follower's dry face. FreeCAD solid intersection and subtraction give a conservative geometric upper bound of 1.873 mL inside the nominal primary reservoir and its manifold, with the piston fully backed against the stop. This calculation includes clearance around the piston and manifold and unoccupied space in both manifold holes, even where a crevice may remain dry. The isolated rear vent, refill bottle, downstream head and wick lie outside that bound. Compliance, dimensional variation, sealing defects and fluid retained during discharge require measurement. The 2 mL ceiling is an internal target for the primary reservoir; regulatory classification and the applicable capacity measurement method require separate review.

The longer refill stem places the pad top at z−18 mm in the authored pose. The pad can move 27 mm to the F12 rear plate. F11 reaches the F13 front surface after 26.05 mm, leaving 0.95 mm of axial margin. The external refill holds several cartridge volumes. Controlling force and avoiding overfill now matter: the full plunger can displace more than an empty cartridge can receive. Bench design still requires metering or another justified fill stop, pressure limitation, leak containment and a defined full condition. No disposable or consumer-facing refill is qualified here.

Verification covers all original nominal solid, mesh, docking and locked-cap checks. Four positions across each travel range produced 24 primary and 36 refill moving–fixed intersection checks with the same CAD tolerance. The envelopes are axisymmetric along the swept paths at their relevant interfaces. For the extended stem, qualify bending under off-axis hand force, impact robustness, buckling and abusive loads. For the longer dry-side bore, the axial vent segment increases from approximately 2.62 to 6.62 mm. Under the same ideal air assumptions as the R01 audit, the full ideal slope increases from 16.14 to about 17.17 Pa per mL/s. Flow, friction, pressure relief and emissions remain unmeasured.

Head removal and power isolation are still required for refill access. Glass-end retention, septum slit recovery, qualified joining, pressure-rated containment, nozzle cleanliness, wet/dry isolation and safe service removal remain open. The unchanged comparator assemblies are geometric test articles; the primary's capacity result does not qualify those alternatives. Preserve the R01 geometry and its calculation audit as a historical baseline.