Moisture barriers
At the base, a perimeter gasket, two screw seals and a captive charging-port cover protect separate openings. A membrane has its own route for equalizing dry-bay pressure.

Moisture barriers
Assembled
Installed positions
Scroll to separate the parts, then follow each numbered marker.
Design science
The perimeter gasket sits in a 0.40 mm gland. A proposed 0.50 mm free height would give 20% nominal squeeze. Moist air can still condense inside a cold enclosure as it warms. Environmental equalization and emergency cell venting need separate flow-capacity assessments.
What needs testing
Track temperature and humidity inside the bay during cold-to-humid transfers. Use separate tracers for splash and reservoir leaks. Check the port both open and closed, then repeat after service, drops and gasket ageing. Water resistance and an operating temperature range remain unmeasured.
Inner parts and interfaces
ENV-SOLEDry-bay sole perimeter gasket
Seals the removable base joint. Installed compression, material ageing and repeated service need evaluation.
A continuous bead follows the removable base joint. Extra gland width leaves room for the elastomer to spread under compression.
Inspect part ↗
ENV-SCREW-LLeft sole screw face seal
Closes the path under the left service screw head.
The left screw penetrates the sole inside its own opening, so it needs a local closure even when the perimeter gasket is seated.
Inspect part ↗
ENV-SCREW-RRight sole screw face seal
Closes the path under the right service screw head.
A separate ring under the right screw head closes the second fastener path and allows that joint to be leak-tested independently.
Inspect part ↗
ENV-PORTCaptive charge-port splash closure
Closes the charging aperture for splash protection during use and storage. The connector is exposed when the plug is open.
A tether keeps the splash plug with the device when the charging aperture is open. The blind tether anchor avoids adding a through-hole.
Inspect part ↗
ENV-VENTDry-bay membrane and adhesive
A membrane on an adhesive perimeter provides a proposed pressure-equalization path with a drainage recess. Battery fault venting requires a separate design.
The dry bay has its own pressure-equalization route so ordinary temperature changes need not vent through the reservoir. Membrane flow and water-entry pressure need testing.
Inspect part ↗