R01 is a nominal packaging and interface concept. Dimensions below are in millimetres in the assembly coordinate system, with +Z toward the mouthpiece. STEP solids support measurement of the fluid and chassis pieces. The head and power pieces have authored mesh geometry and candidate material metadata. Numbers in this review are derived from the generators. Physical tolerances, material specifications, retention, electrical functionality, production acceptance and safety remain open.
Brief coverage
| Project brief section | R01 evidence and remaining work |
|---|---|
| Development budget and premium pricing | Turned shell, service cap and index band can be compared with physical finish samples. No supplier, process capability, quote or retail price established. |
| Why nicotine is required | Fluid reservoir represents an intended nicotine-containing system. No liquid or measured delivery rate exists. |
| What the experience should feel like | Mouthpiece, inlet collar, capillary and heater give geometry for a draw fixture. Draw effort, warmth, cooling, taste and onset remain unknown. |
| What we are designing | Integrated enclosure, reservoir, representative power hardware and head, plus separate refill and cartridge comparisons. Interfaces below still need detailed design. |
| How we know whether it works | Geometry checks permit bench-fixture planning. Physical performance and comparative emissions remain untested. |
| Who needs to contribute | Mechanical engineering owns fits, retention and pressure paths. Electrical engineering owns insulation and energy control. Chemistry, aerosol, microbiology, toxicology, clinical, industrial-design, manufacturing and regulatory specialists own their respective acceptance evidence. |
| How agents should make decisions | Use the ID of each changed part, both mating surfaces, failure mode and required retest. Reopen downstream checks after geometry, material, firmware or liquid changes. |
| Follow contents from manufacture to inhalation | Trace the refill through F14/F05, F01, F04, HD13/03, HD04, HD05 and HD10/11. Bench tests must characterize migration, ingress, fluid flow and emitted substances for fresh and aged assemblies. |
| Engineer the container and interfaces | Three cartridge concepts, rear vent, seals and manifold exist. R01 has open fluidic, retention and accessibility defects described below. |
| Premium mechanical design | Grip grooves, collars, port and recessed service hardware can be sampled. Human handling, surface finish, seal feedback, manufacturing variation, child resistance and wear remain unqualified. |
| Preserve the experience | Reference device and justified bench and human-study endpoints remain open. |
| Build a Blender model | Separate objects can represent assembly, physical paths and unresolved interfaces. Component envelopes require supplier data and engineered drawings. |
| Evidence for each decision | Compare pressure, temperature, leakage, chemistry and emissions synchronously, over repeated units, ages and faults. No measured results exist. |
| Specialist specifications | Formulation identity, chemistry methods, transient heat transfer, aerosol exposure and toxicology need independent verification. Geometric fit is only one input. |
| Agent handback | Preserve source, part IDs, units, dimensions, revision, comparison options and known gaps. |
| Where things stand | Engineering concept available. No physical prototype, production release or health qualification. |
Register cross-reference
- Chassis parts register covers C01–03 sleeves and band, C04 bulkhead, C05–06 isolation collars, C07 sole, C08–09 screw envelopes and C10–11 nut envelopes.
- Fluid parts register covers F01–02 barrel and end plate, F03P/S follower and seal, F04–06 manifold, septum and bezel, F10, F11P/S and F12–16 refill assembly, F20–22 rigid comparator and F30–33 collapsible comparator. Fluid geometry checks apply within each fluid group.
- Head source defines HD01 inlet collar, HD02 carrier, HD03 ferrule, HD04 wick, HD05 heater, HD06–07 contacts, HD08–09 terminations, HD10 trough/chimney, HD11 mouthpiece, HD12 retention seal HD13 outlet face gasket and HD14–15 removable deck screws.
- Power source generates PWR-001–008 charge shield, tongue and contact lands, 009–013 charger board, support shoulders and heads, 014–021 cell, flanges, cushions and tray, 022–032 board and component envelopes, 033–038 tabs and harnesses, 039–045 sensor carrier, contacts and signal harnesses, 046–051 cradle supports and standoffs, 052–063 paired output lands, conductor cores and jackets, barrier bushings, mating pads and insulating carriers, and 064–066 gate-driver, controller and board-temperature sensor packages. Purchased electrical internals remain schematic.
Nominal interfaces and critical conflicts
| Pair | Calculation or observation | Required resolution |
|---|---|---|
| C02 / C05–06 / F01 | Chassis ID 18, collar maximum OD 18 and ID 14, cartridge OD 14. Both interfaces have zero nominal diametral clearance. | Set actual elastomer compression, straightness, flange geometry, glass stress and insertion force. Concentric modeled surfaces provide no tolerance allowance or axial retention evidence. |
| F01 / F03P/S | Barrel bore 12.00 and piston land OD 11.80 give 0.10 radial running clearance. The 0.95 free-section ring installs into a radial depth of 0.80 and groove width of 1.25. Nominal squeeze is 15.8% and section area fill is 70.9% before stretch or swelling. The mesh represents the installed shape. | Validate exact free ring ID, installation stretch, friction, extrusion and changes with liquid and temperature. Measure breakaway and running pressure across tolerance extremes. |
| F02 / C04 / C02 | The 1.30-diameter central rear vent now meets a 1.30 axial passage into a 0.84 radial atmospheric bore at z55.18, crossing the bulkhead–sleeve joint. Three sensor sockets are blind. | Key bulkhead rotation to keep bores aligned and seal across the C04/C02 joint. Measure differential pressure during dispensing and verify liquid isolation during spills and obstruction. |
| F04 / HD13 / HD03 | Outlet boss OD 3.20, bore 1.20, end z86. Gasket starts z86, inlet ID 1.64. Ideal radial opening margin for the liquid bore is (1.64–1.20)/2 = 0.22. Gasket z86–86.14 contacts the ferrule at z86.14 without prescribed preload. | Allocate radial misalignment and axial compression to measurable datums. Qualify the head-to-ledge fastening and cartridge retention, establish a controlled seating stop and measure bypass leakage. |
| F04–06 / F13–15 / HD02 | Port centre (0,+3.70), bezel throat ID 2.40 and pilot OD 2.10 give 0.15 radial clearance. A 1.50-radius nose shoulder clears the neighbouring 1.60-radius boss by 0.60. The 1.20-OD tip projects 1.85 below the seated face. The parked cap has two L slots mating with two nose lugs and 0.65 axial clearance above the tip when locked. Nominal docking solids and locked cap clear the rigid interfering candidates. | Remove head to access refill, then verify alignment throughout angled insertion, the septum slit, leakage during uncoupling and plug damage. Verify bayonet retention force, accidental unlocking, child resistance and ingress; geometric overlap of a lug with its locking land only establishes a nominal retention path. |
| C07 / C08–11 / C01 | Screw shank OD 1.46 versus clearance ID 1.70 leaves 0.12 radial gap. Nut OD 2.72 inside integral lug ID 2.74 gives 0.01 radial gap. Nut bore ID 1.50 against the shank leaves 0.02 radial gap in the smooth nominal envelope. | Specify actual thread, an anti-rotation and axial capture feature or joining process for the nut, tool access, torque and retained pullout after cycling. A cylindrical insert loose in a through-bore does not transmit axial load by itself. |
| C07 / PWR-001 | Slot bounding box 9.70 × 3.80. Shield outer envelope 8.80 × 3.50. Centred bounding-box half-gaps are 0.45 and 0.15. Different corner profiles can reduce the local clearance. | Compute profile-to-profile minimum distance. Validate charging plug, insertion loads and supplier connector mounting, ingress protection and removal access. |
| C04 / PWR / HD06–07 | Routed cores OD 0.36 and jackets OD 0.76 run at x ±7.80 through OD 1.36 bushings, then turn inward to x ±4.60 at z86. The nominal head contact points now meet at z86. C02 has a 1.60-high fastening ledge with ID 14.20. | The 1.36-wide radial keyways in C02 clear a 0.80-wide exact-solid gauge along the inward jog. Verify tolerance margins, strain relief, conductor-to-pad joint, dielectric separation and compliance of touching contacts. Sealing of the nominally tangent bushing OD and bulkhead bore needs positive control. |
| HD10 / HD11 / HD12 | Chimney radius 4.12, mouthpiece receiving radius 4.48, giving 0.36 radial gap. Seal radial range is roughly 4.088–4.512 after scaling, about 0.032 overlap at each side. | Free-state elastomer overlap is intentional only after gland, compression, friction and retention validation. Check fit under wet and worn conditions. No positive mouthpiece lock is proven. |
The complete register contains 114 part instances: 11 chassis, 22 fluid-system, 15 head and 66 power. Of these, 15 fluid-system instances belong to the external refill or the two alternatives, leaving 99 instances in the assembled primary device.
Refill access and service. HD02 covers the septum during normal assembly. With the head removed, the port at (0,+3.70) accepts the vertical refill nose in place. For its fully docked position the CAD script checks the rigid refill nose against the manifold, bezel, actual C02 sleeve and conservative geometry surrounding the two upper power pads and lead bends. The axial gap from the wide nose base to the top of the sleeve is 0.15. Confirm approach, user tilt and tolerance margin on hardware. HD14–15 are M1.2 candidate screw envelopes at y ±8 that engage nominal 1.0-diameter C02 pilots. Their drive lies inside the head, below the chimney. The design still needs a proven sequence to remove the chimney and head, disconnect power safely and avoid losing fasteners or wetting contacts. This head-off procedure is a service concept and needs revision before treating it as routine consumer refilling. The 14.00 cartridge can nominally pass the ID 14.20 ledge, but its flat manifold would strike the fixed electrical pads at x ±4.60 during axial withdrawal. Retracting/removing these contacts or dismantling the upper housing is required before cartridge removal. A serviceable retention system for this purpose remains open.
The nominal axial stack is z0–3 sole, z3–53.45 lower sleeve, z53.45–54.15 band, z54.15–86 upper sleeve and z86–106.10 head. Maximum enclosure diameter is 21.00. Coincident faces at sleeve, band and head joints convey position only. No qualified thread, weld, snap or retained adhesive joint has been established. F02/F04 glass-end retention and pressure ratings remain open. Pairwise non-overlap alone cannot prove an assembled device survives handling.
For the outlet, use required radial alignment margin minus accumulated eccentricity of sleeve, collars, glass barrel, manifold and head. Worst-case radial errors must sum to less than the validated functional margin. For the face gasket, derive minimum and maximum installed compression from the closure stop, stack heights and free gasket thickness. For each fit, compile tolerances, coating buildup, temperature expansion, wear and inspection uncertainty. Use RSS only after validating the distribution and independence of its inputs. Drawing numbers above are nominal assumptions rather than released limits.
Proposed assembly, inspection and service order
- Gauge bore, finish, edge breaks, ovality and valve/seal seats before closure. Assemble the follower with its seal into the barrel, fit the end plate and manifold, then qualify their joints separately. Check vent continuity, liquid leakage, gas ingress, piston breakaway and pressure-flow behaviour using a suitable bench fluid.
- Assemble and inspect the dry-side tray, charge receptacle, cushions, board and harness. Use supplier terminal positions, insulation and cell swelling allowance. A functional cell and heater require a validated electrical design, thermal protection and short-circuit controls.
- Trial-fit the dry assembly in C01 and check charger alignment against C07. Install a designed retention system and confirm pullout and torque after service cycling. Resolve charging-port and feedthrough leakage before combining wet and dry assemblies.
- Fit C04–06, insert the cartridge without loading the glass ends, and verify the atmosphere path and remaining assembly clearance. Install the head at a defined hard stop with measured gasket compression. Confirm lock engagement independently of appearance.
- Inspect each accessible leakage path, including reverse flow from condensate. Verify refill alignment, shutdown and restart with a dummy load before heating. Across controlled bench trials, time-align pressure, mass loss, electrical input, hot-spot temperature and emissions, including near empty and under partial blockage.
- Define what the owner can remove for cleaning or replacement. Demonstrate isolation before decoupling, retained parts, cleanability, drying, detection of incomplete reassembly, residual nicotine handling and safe disposal. Repeat leakage and functional tests after repeated service and a representative drop.
Decisions blocking fabrication release
Select and qualify the reservoir seals, material grades, joining and retention, control of air and condensate, access to the refill, electrical feedthroughs and shutdown, battery containment, service access and dimensional datums. Validate independent containment and insulation after a single foreseeable failure. Establish production drawing tolerances, process capability and inspection acceptance criteria only after correlated prototype tests. Current physical evidence is insufficient to release a manufacturing drawing set, operate an inhalation prototype or support a health claim.