Research libraryTechnical record

R01 fluid mechanics review

The original assembly comparison includes multiple reservoir concepts.
Reservoir alternativesThe original assembly comparison includes multiple reservoir concepts.Open the parts catalogue ↗

Editable nominal geometry is in Fluid.FCStd and build.py. World coordinates use millimetres. Positive Z points toward the device mouthpiece. The model represents assembly interfaces and candidate layouts for bench development. Each part has native B-rep STEP and closed STL exports. Material labels denote candidates.

The primary reservoir occupies a 14 mm diameter by 30 mm envelope. The barrel has a 12 mm bore. A follower piston separates its dry vent from the fluid. The outlet has a 1.2 mm bore within a 3.2 mm boss terminating at z86. A septum at x0, y+3.7 provides separate refill access. The refill syringe and its parked cover sit beside the device. Two comparative assemblies show a rigid vented chamber and a corrugated variable-volume barrier.

The assembled piston seal has an equivalent 0.95 mm free cross section compressed into a 0.80 mm radial gap and 1.25 mm groove width. Nominal section squeeze is 15.8% and gland area fill is 70.9%. The installed shape uses an area-preserving ellipse, not a constitutive material model. Final free ID, stretch, grade, tolerances, swell, extrusion and breakaway pressure need measurement.

The refill connector uses an OD 2.10 mm guide within a 2.40 mm bezel throat and a 1.20 mm OD transfer tube. The 1.50 mm radius shoulder clears the adjacent outlet boss by 0.60 mm; the wider cap-retention base clears the top of the boss axially by 0.15 mm at full mating. That axial margin is especially sensitive to tolerances. F15 has a closed roof and two short bayonet slots; F13 carries matching lugs. The locked cap clears the tip axially by 0.65 mm. Head removal is required for access. The fully docked nose clears the installed C02 sleeve and gauge envelopes around both upper power pads and lead bends. Straight upward cartridge extraction requires withdrawing the fixed pad assemblies or servicing the housing. Manufacture and test a normally closed, pre-slit septum for the blunt transfer tube: the relaxed solid represents its external envelope. Bench validation must confirm reliable insertion, dose containment during and after uncoupling, tip protection, retention torque and unintended opening resistance.

Geometric checks cover within-group interference, nominal axial docking of F13 against F04 and F06, locked F15 clearance to F13/F14, envelope and individual shape validity. Glass-end retention, qualified assembly joints, thermal-expansion effects, child resistance, anti-backflow, reference vent protection, flexible barrier fatigue, material migration and flow remain unresolved. Geometry does not establish inhalation safety.